KENSINGTON PALACE
Project Type:
Historical Refurbishment
Scope of Works:
2nd fix carpentry, fire doors & joinery
Contract Size:
Confidential
Programme:
28 weeks
Client:

DPT carried out the carpentry and joinery package for the refurbishment of the historic Orangery at Kensington Palace. The works included the supply & installation of certified fire doors, bespoke internal and external joinery including toilet cubicle superloos and the manufacture and installation of bespoke timber gates. DPT also supplied and installed solid wood flooring throughout, delivering a durable and heritage-appropriate finish.
The project was delivered in close coordination with the wider design and construction team, ensuring all elements met the required heritage and performance standards while maintaining the architectural integrity of this prestigious setting.