top of page

KENSINGTON PALACE

Project Type: 

Historical Refurbishment

Scope of Works: 

2nd fix carpentry, fire doors & joinery

Contract Size: 

Confidential

Programme: 

28 weeks

Client: 

SRM.png

DPT carried out the carpentry and joinery package for the refurbishment of the historic Orangery at Kensington Palace. The works included the supply & installation of certified fire doors, bespoke internal and external joinery including toilet cubicle superloos and the manufacture and installation of bespoke timber gates. DPT also supplied and installed solid wood flooring throughout, delivering a durable and heritage-appropriate finish.

The project was delivered in close coordination with the wider design and construction team, ensuring all elements met the required heritage and performance standards while maintaining the architectural integrity of this prestigious setting.

© 2026 by DPT Ltd.

bottom of page