ROYAL ALBERT HALL
Project Type:
Historical Refurbishment
Scope of Works:
High end Joinery & Fire doors
Contract Size:
£250k
Programme:
30 weeks
Client:
This was DPT's first project for Sir Robert McAlpine after a rgood eference secured a place in their supply chain. The main element of the contracted works was to replace and upgrade the fire doors in the west arena stairs and south west basement. All of the west arena stair doors formed a part of the new public access route to the hall and the upgraded toilet facilities next to the heinekan bar. DPT supplied and instaleld pannelled walnut stained oak doors, as specified by the architect. The scope also included bespoke fire rated glass screening which required thorough development of the original design to conform with the required fire rating and still match existing. An additional scope was added to the contract to replace and repair doors up on the roof over the dome. All works were carried out while the building remained live, and maintainng the historical protected fabrics surrounding the openings which replacing the doors was an important aspect of the install.